Posted: Dec 10, 2024
Not “ZeroWork” it is “Lots of Work”!
Far away from the concept.
The name implies “Zero Work”, but actually, it requires lots of work. At the end, doing tasks manually, even though time-consuming, is accurate and has the exact time you do it, unlike the so-called “ZeroWork” that requires lots of time for configuration, testing, troubleshooting, and so on.
Moreover, “Zero Tutorials”!
Helpful?
Share